September 17 【Company News】Implementation of Pre-Entry PIP (Proprietary Information Protection) Procedures
PIP Plant Entry Control Procedure
From pre-entry assembly and mobile phone control to personal belongings inspection and final confirmation, AWEITEC follows standardized procedures to ensure compliance with PIP requirements before entering the facility.
Pre-Entry Assembly at the Office
All personnel must assemble at the office before entering the facility.
Secure Mobile Phones in Individual Lockers
Personnel must place and securely lock their mobile phones in their designated lockers in the presence of the verifier.
Personal Belongings Inspection
Five-Point Check | Inspect Five Key Areas
Check the chest area → left pocket → right pocket → both rear pockets / other areas where items may be concealed to ensure no mobile phones, storage devices, or other prohibited items are being carried.
Pocket & Bag Check | Visual Inspection
Open clothing pockets and the cleanroom bag for inspection, clearly showing the contents to confirm that no prohibited items are being carried.
01
02
03
04
05
06
Metal Detector Screening
Conduct an additional screening to ensure that no prohibited items have been missed during the previous inspection.
PIP Control Form
Both the personnel and the verifier must sign the form to confirm completion of the inspection.
Phone Confirmation
After the verifier completes the inspection, confirms that there are no issues, and the personnel have successfully entered the facility, the verifier must report to the supervisor by phone.
The supervisor then reports the completion of the process to the Occupational Safety & Health Department, completing the notification procedure.